  • Established Computer Application Center and installed CDC Cyber 74 system and plotting systems.
  • Kaohsiung Fabrication Shop by Zhong Ji Corporation reorganized and renamed to CTCI Kaohsiung Fabrication Shop
  • Kaohsiung Fabrication Shop expanded by 1,000m2 to 4,000 m2.
  • Contracted survey, engineering design, construction, and equipment supply works of TA/PTA Plant by China American Petrochemical Co., Ltd.
  • Completed Jet Fuel Modification Project by Guam Oil & Refinery Co., Inc.
  • Completed detailed engineering design works of Ethylene Glycol Plant by Oriental Union Chemical Corp.
  • Completed detailed engineering design works of Carbon Dioxide Removal Plant by CPC.
  • Contracted feasibility study of Nitric Acid Plant by China Petrochemical Development Corp.
  • Contracted basic design and detailed design of VGO Hydrodesulfurization Plant by CPC. This was the first time ever that CTCI independently completed plant engineering right from the licensor stage.