Markets

Transportation
An experienced transportation market EPC player with front-rank competency in electrical and mechanical systems design and installation. CTCI has the expertise to complete a full suite of transportation work, including engineering, procurement, construction, testing and commissioning for transportation market clients. In Taiwan, we are trusted by government and private industry alike to carry out transport work that is essential for the development of national infrastructure. It is a reputation we have carried overseas to SE Asia and beyond. CTCI has extensive experience dealing with large-scale public and private transportation projects, from Mass Rapid Transit System (MRT) trackwork and electrical and mechanical systems to airports and high-speed rail electrical and mechanical systems. Our teams have managed numerous projects involving multiple stakeholders, including international consortium partners and market-leading technology holders, which is beneficial to the smooth execution of turnkey projects in the transportation sector.




Our expertise
- Power supply systems
- Trackworks
- Communication systems
- Automatic fare collection
- Integrated Project Management Group
- Supervisory Control & Data Acquisition (SCADA)
- Airport baggage handling systems
- Airport E&M systems
Market coverage
- Mass Rapid Transit systems
- Light Rail Transit systems
- High speed rail
- Airports
Featured projects
Taichung MCT Blue Line System E&M Project
CTCI Group, in collaboration with ST Engineering Urban Solutions Ltd., Alstom Transport S.A., and Hyundai Rotem Company, has secured the contract for the "Taichung MCT Blue Line System E&M Project." This 24.78-km line features 20 stations (8 elevated and 12 underground) and a Grade 5 maintenance depot. Spanning from the coastal areas to the downtown core, the project is scheduled for completion in 2034. By linking major hubs such as Shalu and Taichung Stations and intersecting with the existing Green Line—also built with CTCI’s involvement—it will form a comprehensive "cross-shaped" rail network. CTCI will leverage its expertise in core power supply systems to deliver this vital infrastructure with high quality and on schedule, further driving Taichung's urban development.
Taipei MCT Circular Line North and South Sections System E&M Project
CTCI Corporation has won a contract with consortium partner Alstom, global leader in sustainable mobility, to provide system-wide electrical and mechanical (E&M) works for Taipei Metro’s circular line north and south sections. The 20.66-km circular line north and south sections categorized as medium capacity driverless transit include 18 underground stations and a depot. Once completed in 2031, they will join the current section of circular line in operation to form an outer ring linking red, blue, orange, green, brown lines, and Taoyuan Metro Airport Line, bringing convenient means of transport to people living in Greater Taipei Area. The scope of contract includes driverless rolling stock, track work, depot equipment, system integration, power supply, telecommunication, ticketing, platform screen doors, and monitoring system.
Taipei MCT Wanda Line (Phase II) System E&M Project
CTCI, together with the French multinational company ALSTOM Transport S.A. and Alstom Brasil Energia e Transporte Ltda, won the bid again after contracting the phase I of the system-wide E&M project of the line in 2018. This WanDa Line (WanDa-Zhonghe-Shulin Line ) phase II project is a continuation of the phase I, with a total length of approximately 13.3 km and 13 stations. It is scheduled to be completed by the end of 2030 and will be connected to the Xinzhuang Line, becoming the first successfully connected transportation link in the New Taipei MRT "Three Circles and Three Lines" plan. The Circle Line can be interchanged with the existing Xindian Line, Circular Line, Tucheng Line, and Xinzhuang Line, promoting the integrity of the development of the MRT network in the greater Taipei and providing safer and more convenient transportation services to the public.
Taipei MCT Wanda Line (Phase I) System E&M Project
CTCI was awarded WanDa Line (Phase I) System E&M Project from Department of Rapid Transit System (DORTS), Taipei City Government by joining hands with the French multinational company ALSTOM Transport S.A. and Alstom Brasil Energia e Transporte Ltda. The phase I of the contract consists of nine underground stations and one depot and is 9.5 km long (including 700 m for branch line). This is a system-wide E&M contract, whose scope encompasses rolling stock, signaling (platform screen doors included), power supply, communication, automatic fare collection system, trackworks, depot equipment, and Project Management and System Integration. The project is scheduled to be completed by the end of 2027 which is a medium capacity driverless transit system, and will provide a safe and easy access of transportation to passengers going to/from Taipei City and Zhonghe District, Tucheng District of New Taipei City.
Taipei MCT Xinyi Line East Extension Power Supply Systems Project
The east extension section of the Xinyi Line is connected to the east of the tail rail of Xiangshan Station of the MRT Xinyi Line and extends eastward with a Mass Rapid Transit underground Systems, add a crossing line and R03 station along Section 6 of Xinyi Road (originally planned R04 station, which has been cancelled) to Fude Street in front of Guangci Boai Park. From the east of the R03 station, a shield tunnel will be used along Fude Street and Zhongpo South Road to Yucheng Park. The total length is about 1.4 km, and 1 underground station and tail rail for operation dispatching.
Taichung MRT Green Line System E&M Project
CTCI was awarded the system E&M contract for Taichung Rapid Transit Systems in April 2011. The approximately 16.71 km route has 16 elevated stations, 2 ground stations, 2 bulk supply substations (BSS), and 1 five-level depot. The route links the Taichung THSR Station and the Taichung City center, which connects the Beitun, North, Xitun, Nantun, South, and Wuri Districts in Taichung City, providing an efficient and fast means of transportation for riders while effectively relieving traffic jams.
Singapore Mass Rapid Transit Downtown Line Stage 3 Trackwork Project
CTCI won the trackwork contract for Singapore’s Mass Rapid Transit Downtown Line Stage 3 project in February 2011. The approximately 21km route length with 16 stations aims to provide efficient and fast travel for commuters from the eastern sector of the island to the city centre. The line, due to open in 2017, will provide a viable alternative for commuters seeking to switch to rail transport from cars, and help relieve stress on the already heavily congested road network. In the face of an extremely challenging schedule, CTCI was able to achieve all the monthly project milestones on time. In addition, CTCI received two Health, Safety and Environment (HSE) awards from the client for its excellent safety track record and construction safety standards.
Taoyuan International Airport Baggage Handling System Solutions
CTCI worked closely with Taoyuan International Airport Company (TIAC) to deliver an intelligent automated baggage handling solution that enabled TIAC to effectively manage rapid passenger growth.
Our work
Major EPC and EPCC projects by CTCI
Project
Taipei MCT Circular Line North and South Sections System E&M Project
Process & Capacity
20.66 km, 18 stations
Status
Progressing (2031)
Project
Taipei MCT Wanda Line (Phase II) System E&M Project
Process & Capacity
13.3km, 13 stations
Status
Progressing (2030)
Project
Taipei MCT Wanda Line (Phase I) System E&M Project
Process & Capacity
9.5km, 9 ground stations, 1 depot
Status
Progressing (2027)
Project
Taipei MCT Xinyi Line East Extension Power Supply Systems Project
Process & Capacity
1.54km, 1 station
Status
Completed in 2023
Project
Singapore MRT Thomson Line Trackwork Project
Process & Capacity
Route Length 30km, Track Length 105km
Status
Completed in 2022
Project
Taichung Medium Capacity Transit Green Line
Process & Capacity
16.7km, 18 Stations
Status
Completed in 2021
Project
Singapore MRT Downtown Line Stage 3 Trackworks Project
Process & Capacity
Route length 21km, Track Length 55km
Status
Completed in 2016
Project
Taipei MRT Xinyi/Songshan Lines System E&M Project
Process & Capacity
14.9km, 15 Stations
Status
Completed in 2015
Project
Taoyuan International Airport T2 BHS System Upgrade and Retrofit Project
Process & Capacity
Upgrade Main Sorter System, Add Induction and Makeup, Retrofit CCTV and Lighting Systems, etc. It was T2 BHS Retrofit Phase II Project.
Status
Completed in 2015
Project
Taoyuan International Airport T2 BHS Computer & Control System Upgrade, and Equipment Revamping Project
Process & Capacity
Upgrade Central Computer System and Field Control System, Replace Conveyer Equipment, Provide Early Baggage Solution, etc. It was T2 BHS Retrofit Phase I Project.
Status
Completed in 2014
Project
Taipei MRT Xinzhuang/Luzhou Lines System E&M Project
Process & Capacity
28.6km, 23 Stations, 2 Depots
Status
Completed in 2012
Project
Kaohsiung MRT Orange Line Trackworks Project, Taiwan
Process & Capacity
Route Length 14.2km, Track Length 42km
Status
Completed in 2009